‘Water’ is at the core of human survival on this planet. However, due to constant increase in the demand & decreasing ground water level, the world is facing severe water crisis. Many areas in our country are facing acute water crisis issue and Bihar is one of them. 

Decline in ground water level is causing drinking water crisis in many areas of southern Bihar. According to the Central Ground Water Board records, ground water level near Chandchaura Chowk of the Gaya city decreased by 0.52 meters in the year 2019-20 while in Rajgir it went down by 5.06 meters in the last decade. That’s why all the rivers in these areas remain dry during the major part of the year. 

Ensure availability of drinking water in Gaya, Bodh Gaya and Rajgir cities became a challenge for the government. 

Mr. Sanjay Kumar Agarwal (Secretary, Water Resources Department, Bihar)

A plan which included utilizing the flood water of the Ganges to supply water in the water scarce regions of southern Bihar under the state government’s ‘Jal Jeevan Hariyali’ mission was proposedto solve the issue. Stature government’s Water Resources Department therefore,  launched a scheme – Ganga Water Lift Scheme, later renamed as Ganga Jal Aapoorti Yojana, to make the plan a reality. 

In an exclusive conversation with Indian Masterminds, Secretary, Water Resources Department Mr. Sanjay Kumar Agarwal talked about the project and how it has been implemented. 

CONSTRUCTION TO TRANSPORTATION 

Main challenge in this project was to store & lift the surplus water and distribute in the areas where it is needed. Under the project, water is lifted from Intake well-constructed at Hathidah, Mokama having NSL (Natural Surface Level) 43.65m  and  transported upto Manpur, Gaya where NSL is 114m.

“ The difference of level is around 70 meters. On the other hand carrying the water to around 150 km was also gigantic task but technology came handy. Along with Intake well, Pump House and Approach Channel at Maranchi with Diaphragm Wall Technology, three water treatment plants, Detention Tank (Storage capacity of 78500 cum ) and three water reservoirs have been constructed”, said IAS officer Mr. Agarwal. 

Under the project, water is lifted from Intake well-constructed at Hathidah, Mokama and  transported to Manpur, Gaya

For transportation of water from Mokama to the destinations measured at 151 kilometres, mild steel pipelines (MSP) of different measurements have been laid down. Ganga water is now being distributed as drinking water in three  cities – Gaya, Bodhgaya and Rajgir – and each of them has a treatment plant and distribution network.

ENSURED WATER SUPPLY TILL 2051 

Most significant benefit being reaped by the scheme is improvement in the water table of these areas. These places used to face severe water scarcity every year due to their geographical location and depleting ground water level issues. 

Highlighting the longevity of the project Mr. Agarwal added, “The Ganga Jal Aapurti Yojna is implemented by keeping in mind the future population of these areas till year 2051. Proper maintenance arrangements have been made for that.”

The project has solved two issues simultaneously. It now keeps the north Bihar safe from massive annual flood and also provides water supply to the draught prone areas of South Bihar. Schemes like Ganga Jal Aapurti Yojna serve as a model of sustainable ecological management and can be significant for water-stressed regions in India. 


Indian Masterminds Stories
Join our WhatsApp Channel
ADVERTISEMENT
ADVERTISEMENT
Related Stories
ADVERTISEMENT
ADVERTISEMENT
NEWS
Jamtara Medical College Project
Jharkhand to Set Up New Medical College in Jamtara with 100 MBBS Seats and 420-Bed Hospital
IRS Officer Indian revenue Services
CBIC Grants Non-Functional Selection Grade to 106 IRS (C&IT) Officers; 105 Get Benefit from January 2004
PMO-building
Centre Appoints IAS Thiyagarajan S M, IRTS Praveen Kumar Tiwari to Cooperation Ministry; Saurabh Named Steel Ministry Director
CBI
Who Is Harish Kumar Tanwar? IIT Delhi-Educated IRS Officer Arrested by CBI in ₹1 Crore Bribery Case
CISF
CISF Restructures Steel, Coal and Power Sectors, New System Effective October 15, 2026
rvnl mou
RVNL Signs MoU with DVC to Develop Rail Infrastructure for Power Plants and Coal Mines
Allahabad High Court Advocate Pending Disciplinary Inquiry Ruling
Allahabad High Court Transfers 35 Judicial Officers: Satyendra Kumar Named Unnao District Judge
IRCTC
IRCTC Appoints Raj Kumar Verma as Group General Manager, Effective October 15, 2026
ADVERTISEMENT
ADVERTISEMENT
Videos
Dr Saket Badola IFS
Beyond Tigers and Safaris: How Corbett Literature Festival Wants to Change the Conservation Conversation
PK Jena
Why Technology Cannot Replace Human Connection in Governance: P.K. Jena
PK Jena
The IAS Officer Who Put People Before Paperwork: How PK Jena Challenged Corruption and Reformed Governance
ADVERTISEMENT
UPSC Stories
Aayush Sharma
Three CDS Attempts, Five AFCAT Qualifications & Medical Setback: How Aayush Sharma Secured CAPF AIR 135
After three unsuccessful SSB attempts, five AFCAT qualifications and a medical setback, Aayush Sharma...
Tushar Chaudhary IRMS
He Left Intel, Built COPAL-19, Spent Months at AIIMS, Ran Half Marathons, and Returned to UPSC—Tushar Chaudhary’s Journey to IRMS
UPSC ESE AIR 4 Tushar Chaudhary left a ₹25 LPA Intel job, built COPAL-19, spent months at AIIMS, ran...
Mayank Sachan UPSC CAPF
15+ Exam Failures, 15 Years in the Navy: How Mayank Sachan Secured AIR 343 in UPSC CAPF
Former Indian Navy sailor Mayank Sachan secured AIR 343 in UPSC CAPF 2025 after 15+ exam failures, two...
CSR NEWS
HURL ALIMCO
HURL Signs MoU with ALIMCO to Support Divyangjans and Senior Citizens in Gorakhpur, Barauni and Sindri
Under its CSR initiative, HURL will support PMD-VK Gorakhpur and facilitate the distribution of need-based...
MDL CSR Support to Divyasha Vayoshri Kendra
MDL Extends ₹3.79 Crore CSR Support to Divyasha Vayoshri Kendra in Mumbai
The initiative will strengthen access to assistive devices, prosthetics and rehabilitation services for...
MCL CSR Projects
Mahanadi Coalfields Signs MoU for Five CSR Projects Worth ₹22.64 Crore in Odisha’s Sundargarh District 
The projects will focus on rejuvenating three water bodies, promoting freshwater aquaculture in Hemgir...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Latest
Jamtara Medical College Project
Jharkhand to Set Up New Medical College in Jamtara with 100 MBBS Seats and 420-Bed Hospital
IRS Officer Indian revenue Services
CBIC Grants Non-Functional Selection Grade to 106 IRS (C&IT) Officers; 105 Get Benefit from January 2004
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Videos
Dr Saket Badola IFS
PK Jena
PK Jena
ADVERTISEMENT
ADVERTISEMENT