RECPDCL Hands Over Ranipur Chunar Power Transmission SPV to H G Infra Engineering for UP Project 28 September 2026
Power Ministry Directs 112 Captive Coal Plants of 50 MW and Above to Maximise Generation From October 28 September 2026
NTPC Commissions 81.34 MW Kalasar Solar Project in Rajasthan, Group Capacity Reaches 91,302 MW 28 September 2026
POWERGRID Appoints Dharambir Kumar as Head of North Eastern Region Transmission System 25 September 2026
NHPC Director (Projects) Sanjay Kumar Singh Reviews Rangit-IV Hydro Electric Project Progress 25 September 2026
PFC, UK FCDO Hold Cybersecurity Workshop for Power Distribution Sector to Strengthen Cyber Resilience 24 September 2026
RECPDCL, ICAR Sign MoA for 11.1 MW Rooftop Solar Systems Across 76 Institutes in 24 States & UTs 24 September 2026
POWERGRID Acquires Barmer HVDC Transmission for ₹18.98 Crore, to Develop 6 GW Project in Rajasthan 23 September 2026