Skip to main content

https://indianmasterminds.com

ADVERTISEMENT
ADVERTISEMENT

PM Modi Approves ₹4,584 Crore Four-Lane Upgrade of NH-56 in Gujarat to Boost Connectivity and Tourism

107.67 km NH-56 Corridor to Enhance Access to Tribal Regions, Reduce Travel Time, and Improve Links to Statue of Unity, NH-48, and Delhi–Mumbai Expressway
Indian Masterminds Stories

New Delhi: The Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, has approved the upgradation of two critical stretches of National Highway 56 (NH-56) in Gujarat to four-lane standards, at a total investment of ₹4,583.64 crore.

Key Project Details

The approved project covers:

  • Dhamasiya to Bitada/Movi: 47.46 km
  • Nasarpore to Malotha: 60.21 km

The total length of the upgraded corridor will be 107.67 km, implemented under the Hybrid Annuity Mode (HAM). The four-lane highway is designed for a speed of 100 km/h, expected to allow an average speed of 70 km/h, reducing travel time by nearly 40%—from 2.5 hours to 1.5 hours across the project stretch.

Read also: Gujarat to Simplify Urban Development with ‘Everything Permitted Unless Prohibited’ Policy for Land and Construction

Strategic Route and Connectivity

NH-56 originates at Nimbahera in Rajasthan, passes through Dahod district (Gujarat), Alirajpur district (Madhya Pradesh), and re-enters Gujarat near Chhota Udepur, terminating at NH-48 near Vapi.

The upgraded stretches pass through the aspirational district of Narmada and are expected to improve connectivity to tribal regions in Dahod, Chhota Udepur, Tapi, and Bharuch districts. The corridor will also enhance access to the Statue of Unity in Kevadia, located just 11 km from NH-56.

Economic and Social Benefits

Officials highlighted that the upgradation will:

  • Spur economic growth and social development in tribal regions.
  • Establish a continuous four-lane corridor from Bodeli to Malotha, easing congestion on NH-56.
  • Improve connections to NH-53, NH-48, and the Delhi–Mumbai Expressway (NE-4).

The project is also expected to generate significant employment:

  • Direct employment: ~19.38 lakh man-days
  • Indirect employment: ~22.82 lakh man-days

Additional jobs are anticipated due to economic activity along the upgraded corridor.

Ongoing NH-56 Developments

Earlier, the Ministry of Road Transport and Highways, through the National Highways Authority of India (NHAI), awarded stretches from Jambugam (Bodeli) to Dhamasiya and Movi to Nasarpore in November 2025. These sections are currently under construction with a two-year completion timeline.

Once completed, NH-56 will become a modern, high-speed arterial route, providing smoother travel and better connectivity for both commercial and tourist traffic.

Read also: Gujarat Government Appoints Veteran Banker Uday Kotak as Chairman of GIFT City to Boost Strategic Growth


Indian Masterminds Stories
Join our WhatsApp Channel
ADVERTISEMENT
ADVERTISEMENT
Related Stories
ADVERTISEMENT
ADVERTISEMENT
NEWS
npcil reactor
NPCIL Awards Major Generator Transformer Order to TARIL for Kaiga Nuclear Power Project
Hindustan Copper Rajbhasha Award
Hindustan Copper Wins First Prize for Rajbhasha Implementation in Kolkata NARAKAS for 2025–26
sweeping tool delhi
Delhi’s New Dust Fighters: 70 GPS-Tracked Sweepers Coming Soon
EIL MC²+ Ignite
EIL Joins MC²+ Ignite Launch at IIT Madras to Accelerate Deep-Tech Startups in India’s Energy Sector
Chhattisgarh PM GatiShakti MoUs
Chhattisgarh Signs Two MoUs to Bring Geospatial Data, Logistics Analytics Into Infrastructure Planning
Landfill Cleanup delhi
Delhi Reclaims 100 Acres From Garbage Mountains, Steps Up Landfill Cleanup
Ayush Gupta Visionary Award
GAIL Director (HR) Ayush Gupta Honoured with Visionary Award for Strategic Human Capital Leadership 
Critical mineral block auctions
Chhattisgarh: Nava Raipur to Host Roadshow on Auction of 20 Critical and Strategic Mineral Blocks
ADVERTISEMENT
ADVERTISEMENT
Videos
Keshav kumar
From Police Officer to Forensic Pioneer: How Dr Keshav Kumar Made Science a Weapon Against Crime
ChatGPT Image Aug 20, 2026, 05_46_21 PM
How IPS Officer Keshav Kumar Used Forensics to Crack Gujarat’s Lion Poaching Case
Shakeel Ahmad Ganie IRS Interview
‘My Path Has Not Been Straight’: Shakeel Ahmad Ganie’s Journey to the IRS
ADVERTISEMENT
UPSC Stories
Naveen Kumar Saini UPSC CAPF
After 3 NDA Attempts and a 7-Mark Miss, Naveen Kumar Saini Gets AIR 7 in UPSC CAPF 2025
Naveen Kumar Saini secured AIR 7 in UPSC CAPF 2025 after multiple NDA and SSB failures and missing CAPF...
Pankaj Kamboj
Father Died, Family Turned to Farming: How Pankaj Kamboj Fought His Way to CAPF
After losing his father at 14 and helping his family survive through farming, Pankaj Kamboj turned repeated...
Prachi Jain
A Failed Prelims, A Fractured Leg & One More Shot: How Prachi Jain Made AIR 714
Prachi Jain secured AIR 714 in UPSC CSE 2025 after setbacks, injury and two interviews, and now prepares...
CSR NEWS
bel
BEL Lays Foundation Stone for Modern Crematorium at Lucknow Cantonment Under CSR Initiative
Rajnath Singh, Yogi Adityanath and BEL CMD Manoj Jain Attend Ceremony; Facility Aims to Provide Dignified...
GSK Scholars Programme
How a Scholarship Is Helping Build India’s Next Generation of Doctors
For these young medical professionals, an MBBS degree was not merely an academic milestone. It was a...
GRSE CSR Times Award
GRSE Wins CSR Times Award 2026 for ‘Hockey for Her’ Initiative Empowering Tribal Girls
GRSE’s CSR programme with CRY supports over 100 young athletes in Jharkhand through hockey training,...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Latest
npcil reactor
NPCIL Awards Major Generator Transformer Order to TARIL for Kaiga Nuclear Power Project
Hindustan Copper Rajbhasha Award
Hindustan Copper Wins First Prize for Rajbhasha Implementation in Kolkata NARAKAS for 2025–26
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Videos
Keshav kumar
ChatGPT Image Aug 20, 2026, 05_46_21 PM
Shakeel Ahmad Ganie IRS Interview
ADVERTISEMENT
ADVERTISEMENT