The Maharatna PSU, Bharat Heavy Electricals Limited (BHEL), roped in an order worth Rs. 3,500 crores (excluding GST) from Adani Power Limited on June 5, to set up a thermal power project at Raipur in Chhattisgarh.
The PSU mentioned in an exchange filing that they have “signed contract agreement signed June 5, supply of equipment (boiler, turbine, generator) and supervision of erection and commissioning for 2×800 MW power project based on Supercritical Technology.” It was also announced that the boiler and turbine generator for the projector shall be manufactured at BHEL’s Trichy and Haridwar plants, respectively.