Ahmedabad: Gujarat Chief Minister Bhupendra Patel on November 16 reviewed the progress of Phases 2 and 3 of the Sabarmati Riverfront Development Project during an inspection of several construction sites in Ahmedabad.
The expansion project is expected to extend the total length of the riverfront to 40 km along both banks of the Sabarmati upon completion of the two phases. The works include new road infrastructure, a six-lane barrage-cum-bridge, landscaped public spaces and recreational facilities.
During the inspection, Patel visited the construction sites of the barrage-cum-bridge connecting Acher and Camp Sadar Bazar, the canopy structure at Sardar Patel Enclave, and development works near Koteshwar Mahadev Temple, Indira Bridge, Kotarpur and Karai.
He reviewed the progress with senior officials and directed them to ensure timely completion of the ongoing works.
Phase 2 and Phase 3 to Add 21 Km of Riverfront
The two phases will extend the riverfront northwards towards Gandhinagar, covering stretches between Dafnala, Indira Bridge and the Narmada Main Canal.
The proposed expansion includes:
- Phase 2: Development along a 5.5-km stretch on each bank, from Dafnala to Indira Bridge, adding 11 km to the riverfront.
- Phase 3: Development along a 5-km stretch on each bank, from Indira Bridge to the Narmada Main Canal, adding another 10 km.
Together, the two phases will add 21 km of riverfront development along the eastern and western banks.

Six-Lane Barrage-Cum-Bridge to Feature Automatic Rubber Barrage
One of the major infrastructure components being developed under Phase 2 is a six-lane barrage-cum-bridge connecting Acher on the western bank with Camp Sadar Bazar on the eastern bank.
The structure will incorporate an automatic control system and a specialised air-filled rubber barrage measuring 3.5 metres in height. The barrage is designed to help retain water along the riverfront towards Gandhinagar.
According to the Gujarat government, the rubber barrage will be the first of its kind in the state.
The bridge is expected to serve both transportation and water-management purposes as the riverfront expands beyond the existing developed stretch.
Green Spaces, Food Plazas and Recreational Facilities Planned
The expanded riverfront will include public spaces and amenities intended to improve recreational access along the river.
The proposed facilities include:
- Green spaces and multi-level tree plantations along both banks.
- Dedicated children’s play areas.
- Food plazas and public seating spaces.
- Art and cultural facilities.
- Health and wellness amenities.
- Landscaped promenades and other public-use areas.
These facilities are planned as part of the broader urban development of the riverfront.
Senior Officials Accompany CM During Inspection
The Chief Minister was accompanied by Ahmedabad Mayor Hitesh Barot, Standing Committee Chairman Kamlesh Patel, Sabarmati Riverfront Development Authority Chairman Dr. I.P. Gautam (IAS: 1989: GJ) and Ahmedabad Municipal Corporation Commissioner Banchhanidhi Pani (IAS: 2005: GJ).
Gandhinagar Municipal Commissioner J.S. Prajapati (IAS: 2014: GJ) and other officials from the municipal corporations and the Sabarmati Riverfront Development Authority also participated in the inspection.
The project is being implemented through the Gujarat government’s Urban Development and Urban Housing Department in collaboration with Sabarmati Riverfront Development Corporation Limited.
Read Also: GSRTC Sets Single-Day Digital Ticketing Record with 1.46 Lakh Seat Bookings on Bhai Beej














