Skip to main content

https://indianmasterminds.com

ADVERTISEMENT
ADVERTISEMENT

Gujarat: Vadodara Ring Road Project—66 km ₹1,500 Crore Mega Corridor Set to Transform Traffic and Connectivity

VUDA–VMC Complete First Phase of 75-Meter Wide Ring Road, Linking NH-48, Expressway and Key Highways to Ease Urban Congestion
Indian Masterminds Stories

Vadodara: In a major boost to urban infrastructure and traffic management, the Vadodara Urban Development Authority (VUDA) and Vadodara Municipal Corporation (VMC) have completed the first phase of the ambitious 75-meter wide Ring Road project. The mega infrastructure initiative is expected to significantly reshape the city’s transport network and economic landscape.

Massive ₹1,500 Crore Infrastructure Project

The 66-kilometre-long Ring Road project, being developed in five phases, carries an estimated cost of ₹1,500 crore.

Key highlights include:

  • Total length: 66 km (5 phases)
  • First phase completed: 27.5 km
  • Cost of Phase 1: ₹316 crore
  • Width: 75 meters

The project is being executed jointly by VUDA and VMC, with technical guidance from experts of CEPT University.

Read also: Gujarat to Launch ‘Namo Swadeshi Urban Malls’ in Ahmedabad, Surat, Vadodara & Rajkot to Boost Local Products

Improved Connectivity Across Highways and Expressways

Once fully completed, the Ring Road will provide seamless connectivity across major transport routes, including:

  • National Highway-48
  • Delhi–Mumbai Expressway
  • Multiple state highways

Officials say the corridor will serve as a critical link between the eastern and western parts of Vadodara, improving traffic flow and reducing congestion within the city.

Designed for Modern Urban Mobility

The project includes several advanced infrastructure features such as:

  • High-tech drainage systems
  • Dedicated service roads
  • Modern street lighting infrastructure

These upgrades aim to ensure long-term durability, safety, and efficiency in urban transport.

Major Relief from Traffic Congestion

According to Vadodara Municipal Commissioner Arun Mahesh Babu, the Ring Road will significantly reduce traffic pressure inside the city.

Key benefits include:

  • Heavy vehicles diverted outside city limits
  • Reduced traffic jams within urban areas
  • Lower fuel consumption and travel time
  • Improved inter-regional connectivity between North and South Gujarat

Positive Response from Citizens

Local residents have welcomed the project, calling it a major convenience for daily commuters.

A resident, Yogesh Joshi, said the road will help save both time and fuel costs, while senior citizen Shakuntalaben Joshi highlighted its safety and ease of travel for elderly commuters.

Phase 2 Construction to Begin Soon

The first phase of the project covers key areas including Kapoorai. Authorities are now preparing to launch Phase 2 construction work shortly.

Experts believe that once fully completed, the Ring Road will position Vadodara as a major logistics and transport hub in western India, boosting trade and economic activity in the region.

Read also: Gujarat Deputy CM Harsh Sanghavi Unveils ₹203 Crore Urban Infrastructure Projects in Vadodara


Indian Masterminds Stories
Join our WhatsApp Channel
ADVERTISEMENT
ADVERTISEMENT
Related Stories
ADVERTISEMENT
ADVERTISEMENT
NEWS
Patna Ganga Encroachments Case
Supreme Court Sets 6-Week Deadline for Bihar to Remove Patna Ganga Encroachments
Public Accounts Committee Defence Report
Inside the Dhanush Gun Programme Delays and ₹62.10 Crore Loss Over Defective Army Ammunition
Operation Lancer
Operation Lancer: Distressed Cargo Ship MV Pyra Rescued After Propulsion Failure Near Great Nicobar Island
Kandula Jessie
Meet Kandula Jessie, 14-Year-Old Andhra Schoolgirl Selected for Global Mission ShakthiSAT
India Private Space Sector Investment
India’s Space Startup Revolution: Private Investment Crosses $618.5 Million 400+ Startups Active
Bharat Renewable Energy Summit & Expo 2026
Everything You Need to Know About Bharat Renewable Energy Summit & Expo 2026 that Attract 34 Countries
paper leak cases
Paper Leak Cases Crackdown: Bombay High Court Names 2 Judges for Fast-Track Cases
India auto parts industry
India Auto Parts Industry Growth Outlook: Goldman Sachs Projects 10% CAGR on EV, Chip and Defence Push Through FY30
ADVERTISEMENT
ADVERTISEMENT
Videos
Piyusha Jagtap
How IFS Piyusha Jagtap Is Changing Conservation Through Stories, Communities and Compassion | Video Interview
Pulkit Khare
How Uttar Pradesh Is Preparing Its Youth for the AI Revolution
Haryana Leads India's First AI-Powered Bird Census
Haryana Leads India's First AI-Powered Bird Census
ADVERTISEMENT
UPSC Stories
nitesh upsc
CSE 2025 AIR 562 Nitesh Chose India Over an American Dream and Reached Civil Services After Six Attempts
UPSC CSE 2025 AIR 562 Nitesh's inspiring journey from a small village in Madhya Pradesh to IIT Bombay,...
WhatsApp Image 2026-07-19 at 9.46
Why So Many UPSC Aspirants Fail Despite Studying So Hard
Many UPSC aspirants mistake attending lectures for preparation, but the examination rewards independent...
Sanjay Bagali and Deekshith N UPSC IFS 2025
How Trust, Teamwork and Persistence Helped Two Friends Crack UPSC IFS 2025
Read the inspiring UPSC IFS 2025 success story of Deekshith N (AIR 14) and Sanjay Bagali, whose friendship,...
CSR NEWS
NCL CSR
NCL Signs ₹11.71 Crore CSR MoU to Build 8-Km Road in Singrauli, Boost Rural Connectivity
Northern Coalfields Limited partners with MPRRDA to construct Obri-Kasaiya via Kanhaiya Dah road, improving...
MCL CSR
MCL to Build 5 Km BT Roads in Odisha’s Angul with ₹5.35 Crore CSR Support for Better Connectivity
Mahanadi Coalfields Limited signs MoU for road development in Athmallik NAC to improve all-weather transport...
WCL
WCL Partners with Narayana Institute Nagpur to Provide Free JEE Coaching Under Project TARASH
WCL signs MoU with Narayana Institute for the 4th batch of Project TARASH, offering expert JEE coaching...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Latest
Patna Ganga Encroachments Case
Supreme Court Sets 6-Week Deadline for Bihar to Remove Patna Ganga Encroachments
Public Accounts Committee Defence Report
Inside the Dhanush Gun Programme Delays and ₹62.10 Crore Loss Over Defective Army Ammunition
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Videos
Piyusha Jagtap
Pulkit Khare
Haryana Leads India's First AI-Powered Bird Census
ADVERTISEMENT
ADVERTISEMENT