https://indianmasterminds.com

ADVERTISEMENT
ADVERTISEMENT

Metro Trains to Start Running in MP from Next Year: Chhavi Bhardwaj, MD, MPMRCL

Indian Masterminds Stories

Madhya Pradesh will soon join member states Uttar Pradesh, West Bengal, Rajasthan, Karnataka, and Delhi-NCR in the Metro Rail club. And the IAS officer who is leading the state into joining this club is Ms. Chhavi Bhardwaj. Currently, she is the Managing Director of Madhya Pradesh Metro Rail Corporation Ltd (MPMRCL).

Under her leadership, work on the metro construction project took off at a breakneck speed and is almost nearing completion. Metro trains are now scheduled to start from next year in the state. During an interview to Indian Masterminds, the officer talked about the two metro projects in MP and the challenges she has faced in them. 

EXCERPTS FROM THE INTERVIEW

What are the projects currently going on under Madhya Pradesh Metro Rail Corporation Ltd. (MPMRCL)? 

We have metro plan for two major cities in Madhya Pradesh.  One is in Indore and other one in the state’s capital, Bhopal. Both the projects are currently going on. In Bhopal, we have two corridors covering almost an entire stretch of 30 kms. Similarly, the project going on in Indore covers a 31.5 kms stretch. 

How long will it take for the metro to be up and running in Madhya Pradesh? 

It was important for us to take a time limit and commission the project. However, completing the entire project in both the cities will take time. So, we are focusing on commissioning the first segment, or you can say, the priority corridors. In Bhopal, the corridor runs from AIIMS to Shubash Nagar, covering a 7 km stretch. While in Indore, the corridor is of 17 km, running between Radission Square to Airport with 15 stations in between. We have already recovered the backlog in construction and are hopeful to commence metro trains from September 2023.

Will this project connect the whole city?

Our aim is to ensure better connectivity and respectively cheaper mode of public transport for the people. With the completion of priority corridors in both the cities, people from various parts of the city would be able to come to the commercial centres and premier health institutions. Since Bhopal is more widely spread, so we will have to complete the entire 30 km stretch in order to connect the whole city. Still the 7 km corridor will reach a lot of people. 

Since Bhopal is an old and crowded city, did you face challenges in terms of construction? 

The 7 km corridor which is on priority spreads over the newer part of the city, locally called New Bhopal. This part is comparatively clear, so it was not difficult, as there was very less issues of removal or reinstallation during the construction. In most of the segments, we easily got ROWs (type of easement over the land for transportation) along the median of the road. However, in the centre of Bhopal, we have taken 3 km underground segment, as there was no possibility of cutting through it. 

What about Indore? 

We had to take 7 km underground segment in the heart of Indore. Although the cost of constructing underground metro is thrice the cost of the elevated one, in congested areas where the possibility is zero, we are going ahead with underground metro. Municipal Corporation is there to coordinate and help us. So, we hope to complete the project in time.  


Indian Masterminds Stories
Join our WhatsApp Channel
ADVERTISEMENT
ADVERTISEMENT
Related Stories
ADVERTISEMENT
ADVERTISEMENT
NEWS
SFAC MD
ACC Appoints Two IAS Officers as GSTAT Technical Members; Extends Devendra Kumar’s DBT Mission Tenure
bihar
Bihar Tourism Push: Govt Launches ₹2,700 Crore Projects to Transform State into Global Tourist Destination
nmdc resized
NMDC Appoints Vivek Nishant Nath as Director (Commercial) for Five-Year Term
MRPL
MRPL Q1 FY27 Results: Net Profit Jumps to ₹946 Crore, Revenue Climbs to ₹41,609 Crore
IAS Arun K Vijayan
Nitta Gelatin India Appoints IAS Arun K Vijayan as Board Director After KSIDC Nomination Change 
punjab
Punjab CM Bhagwant Mann Invites Global Investors, Highlights State’s Textile Powerhouse Potential at BharatTex 2026 
CM Hemant Soren
Jharkhand CM Hemant Soren Orders Completion of Pending Road, Flyover and Bridge Projects Within Two Months
BPCL and Akasa Air Sign MoU
BPCL and Akasa Air Sign MoU to Boost Sustainable Aviation Fuel Adoption and Promote Green Aviation
ADVERTISEMENT
ADVERTISEMENT
Videos
Pulkit Khare
How Uttar Pradesh Is Preparing Its Youth for the AI Revolution
Haryana Leads India's First AI-Powered Bird Census
Haryana Leads India's First AI-Powered Bird Census
Divyanshu patel
How A Single-Minded Devotion of Divyanshu Patel Transformed Moradabad
ADVERTISEMENT
UPSC Stories
Tania Mishra IA&AS
Why Tania Mishra Chose IA&AS After Serving as a CISF Assistant Commandant
Tania Mishra cracked UPSC CSE 2023 with AIR 269 after serving as a CISF Assistant Commandant. Read her...
bhoopendra
Bhoopendra Dhakad: Raised in a Farming Family, Educated at IIT, Chosen by UPSC
IIT Kanpur graduate Bhoopendra Dhakad secured UPSC CSE 2025 AIR 494 after four attempts, overcoming setbacks...
ChatGPTImageJul62026at03_08_06P-2
Balancing Job & Dreams: How Jasmeet Kaur Turned Her Father's Dream into Reality with Rank 1 in UK PCS-2024
Jasmeet Kaur secured Rank 1 in the UKPSC-2024 examination after balancing her duties as a District Social...
CSR NEWS
ntpc
NTPC Strengthens Goa Healthcare Services with 19 Emergency Medical Vehicles Under CSR Initiative 
The CSR initiative includes BLS, ALS and cardiac ambulances along with medicine vans to strengthen healthcare...
MCL
MCL Invests ₹375.87 Crore in Odisha CSR Projects to Drive Healthcare, Education and Community Growth
Coal India Subsidiary Focuses on Healthcare, Education, Livelihood Support and Sustainable Growth Through...
SECL Ke Sushrut Gazette Notification
SECL’s ‘SECL Ke Sushrut’ Becomes First Coal PSU CSR Scheme to Get Gazette Notification
Ministry of Coal enables Aadhaar authentication for SECL’s flagship NEET coaching initiative, enhancing...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Latest
SFAC MD
ACC Appoints Two IAS Officers as GSTAT Technical Members; Extends Devendra Kumar’s DBT Mission Tenure
bihar
Bihar Tourism Push: Govt Launches ₹2,700 Crore Projects to Transform State into Global Tourist Destination
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Videos
Pulkit Khare
Haryana Leads India's First AI-Powered Bird Census
Divyanshu patel
ADVERTISEMENT
ADVERTISEMENT