https://indianmasterminds.com

ADVERTISEMENT
ADVERTISEMENT

Metro Trains to Start Running in MP from Next Year: Chhavi Bhardwaj, MD, MPMRCL

Indian Masterminds Stories

Madhya Pradesh will soon join member states Uttar Pradesh, West Bengal, Rajasthan, Karnataka, and Delhi-NCR in the Metro Rail club. And the IAS officer who is leading the state into joining this club is Ms. Chhavi Bhardwaj. Currently, she is the Managing Director of Madhya Pradesh Metro Rail Corporation Ltd (MPMRCL).

Under her leadership, work on the metro construction project took off at a breakneck speed and is almost nearing completion. Metro trains are now scheduled to start from next year in the state. During an interview to Indian Masterminds, the officer talked about the two metro projects in MP and the challenges she has faced in them. 

EXCERPTS FROM THE INTERVIEW

What are the projects currently going on under Madhya Pradesh Metro Rail Corporation Ltd. (MPMRCL)? 

We have metro plan for two major cities in Madhya Pradesh.  One is in Indore and other one in the state’s capital, Bhopal. Both the projects are currently going on. In Bhopal, we have two corridors covering almost an entire stretch of 30 kms. Similarly, the project going on in Indore covers a 31.5 kms stretch. 

How long will it take for the metro to be up and running in Madhya Pradesh? 

It was important for us to take a time limit and commission the project. However, completing the entire project in both the cities will take time. So, we are focusing on commissioning the first segment, or you can say, the priority corridors. In Bhopal, the corridor runs from AIIMS to Shubash Nagar, covering a 7 km stretch. While in Indore, the corridor is of 17 km, running between Radission Square to Airport with 15 stations in between. We have already recovered the backlog in construction and are hopeful to commence metro trains from September 2023.

Will this project connect the whole city?

Our aim is to ensure better connectivity and respectively cheaper mode of public transport for the people. With the completion of priority corridors in both the cities, people from various parts of the city would be able to come to the commercial centres and premier health institutions. Since Bhopal is more widely spread, so we will have to complete the entire 30 km stretch in order to connect the whole city. Still the 7 km corridor will reach a lot of people. 

Since Bhopal is an old and crowded city, did you face challenges in terms of construction? 

The 7 km corridor which is on priority spreads over the newer part of the city, locally called New Bhopal. This part is comparatively clear, so it was not difficult, as there was very less issues of removal or reinstallation during the construction. In most of the segments, we easily got ROWs (type of easement over the land for transportation) along the median of the road. However, in the centre of Bhopal, we have taken 3 km underground segment, as there was no possibility of cutting through it. 

What about Indore? 

We had to take 7 km underground segment in the heart of Indore. Although the cost of constructing underground metro is thrice the cost of the elevated one, in congested areas where the possibility is zero, we are going ahead with underground metro. Municipal Corporation is there to coordinate and help us. So, we hope to complete the project in time.  


Indian Masterminds Stories
ADVERTISEMENT
ADVERTISEMENT
Related Stories
ADVERTISEMENT
ADVERTISEMENT
NEWS
cm bihar
Bihar CM Samrat Choudhary Announces Major Eco-Tourism Push with PPP Model Development Across Water Bodies
beml
BEML Wins PSE Excellence Award for IoT at Hyderabad 2026, Recognised for Industry 4.0 Smart Manufacturing Push
psu
NSIC India Signs MoU with Papua New Guinea to Boost MSME Collaboration in Technology, Skilling and Trade
drdo Wheeled Armoured Platforms
DRDO Unveils Advanced Tracked and Wheeled Armoured Platforms with Crewless 30 mm Turret
cm-rekha-gupta-
Delhi Govt Orders Transfer of 162 GST Officials, Including 3 Assistant Commissioners, After Surprise Inspection
Himachal IAS IPS Controversy
Himachal Pradesh Govt Transfers 2 IAS Officers, Announces Digital Census 2027 in Two Phases from 2026
Election Commission of India (ECI)
Election Commission Suspends 5 Police Officers in West Bengal Over Alleged Electoral Bias Ahead of Assembly Polls 
Rashtriya Chemicals and Fertilizers, RCF
RCF Secures AA/Stable Rating for NCDs from ICRA and India Ratings, Reinforcing Strong Financial Position
ADVERTISEMENT
ADVERTISEMENT
Videos
Pawan Sareen
Truth Behind India’s LPG Supply Strain Amid Rising Demand and Global Uncertainty 
IAS Saurabh Katiyar
IAS Saurabh Katiyar’s Model of Good Governance: Compassion, Efficiency, and Real Impact
IAS Saurabh Katiyar
How IAS Saurabh Katiyar is Making Government Offices Citizen-Friendly in Mumbai | Video Interview 
ADVERTISEMENT
UPSC Stories
kajal-raju-kasaragod
Born Without a Forearm, Kerala’s Daughter Secures AIR 167 in UPSC CSE 2025
Born without a forearm, Kerala’s Kajal Raju improved from AIR 910 to AIR 167 in UPSC CSE 2025 after four...
WhatsApp Image 2026-04-24 at 3.47
How Manoj Ramchandra Patil Became His Village’s First Civil Servant
Hailing from drought-hit Jalihal village in Maharashtra, Manoj Ramchandra Patil secured AIR 493 in UPSC...
ankit sakni1
Ankit Sakni Becomes Bijapur’s First Civil Services Success Story
Ankit Sakni from Bhairamgarh, Bijapur, secured AIR 816 in UPSC CSE 2025, becoming the district’s first...
CSR NEWS
ews
DVK Foundation Launches Scholarship Programme for EWS Students at BGIS Vrindavan
BGIS Vrindavan Partners with DVK Foundation for EWS Student Scholarships
ECIL
ECIL Completes CSR Project by Handing Over Retaining Wall at Rastriya Vidya Kendra, Telangana
ECIL Enhances Student Safety and School Infrastructure in Medchal-Malkajgiri District Through Corporate...
ntpc
NTPC WR-I Launches ₹7.64 Crore CSR Project to Renovate IPD Blocks at N.M. Wadia Hospital, Solapur
Renovation of Buildings A, B, and Annex to Strengthen Healthcare Infrastructure, Improve Patient Care,...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Latest
kajal-raju-kasaragod
Born Without a Forearm, Kerala’s Daughter Secures AIR 167 in UPSC CSE 2025
cm bihar
Bihar CM Samrat Choudhary Announces Major Eco-Tourism Push with PPP Model Development Across Water Bodies
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Videos
Pawan Sareen
IAS Saurabh Katiyar
IAS Saurabh Katiyar
ADVERTISEMENT
ADVERTISEMENT