Skip to main content

https://indianmasterminds.com

ADVERTISEMENT
ADVERTISEMENT

SECI Plans Two 5 MW Agri-PV Projects in Delhi-NCR, Seeks 20 Acres of Agricultural Land on Long-Term Lease 

Solar Energy Corporation of India seeks minimum 10 acres per project near Issapur and Dhansa villages for pilot projects combining solar power generation with seasonal crop cultivation. 
Indian Masterminds Stories

New Delhi: The Solar Energy Corporation of India Limited (SECI) has invited bids to arrange around 20 acres of agricultural land on lease for setting up two pilot Agri-PV projects of 5 MW each in the Delhi-NCR region.

The proposed projects will be developed in the vicinity of Issapur and Dhansa villages in Najafgarh, Delhi, with SECI seeking a minimum of 10 acres of land for each project.

The initiative aims to demonstrate the potential of Agri-Photovoltaic (Agri-PV) systems, which allow electricity generation through solar panels while enabling agricultural activities and seasonal crop cultivation on the same land.

SECI Seeks 20 Acres for Two 5 MW Agri-PV Projects

Under the proposed tender, SECI plans to establish two pilot Agri-PV projects, each having a capacity of 5 MW.

Key Project Details

  • Projects: Two pilot Agri-PV projects
  • Capacity: 5 MW each
  • Total land requirement: Around 20 acres
  • Minimum land per project: 10 acres
  • Location: Vicinity of Issapur and Dhansa villages, Najafgarh, Delhi
  • Land model: Lease/sub-lease of government or private land
  • Eligible applicants: Landowners and land aggregators

The projects are intended to demonstrate a dual-use model in which solar power generation can take place alongside seasonal agricultural cultivation.

Read also: NTPC REL Secures 500 MW in SECI FDRE-IX Tender at ₹6/kWh Tariff to Expand Renewable Energy Portfolio 

Landowners and Aggregators Can Participate

SECI has invited participation from landowners and land aggregators possessing government or private land that meets the specified requirements.

The selected land will need to have a clear title and must be free from legal disputes and other encumbrances.

The land should not be subject to:

  • Legal disputes
  • Mortgages
  • Acquisition notices
  • Other claims or encumbrances

The land will be required to be leased for a minimum period of 27 years, with the possibility of extension through mutual consent.

Land Requirements for Agri-PV Projects

SECI has specified several conditions for the land proposed for the pilot projects.

The selected site should:

  • Be suitable for dual-use Agri-PV systems.
  • Allow seasonal crop cultivation alongside solar power generation.
  • Be level or gently sloping.
  • Be free from waterlogging.
  • Have access through an approach road.
  • Be located near Discom transmission infrastructure of 11 kV or higher voltage.

These requirements are aimed at ensuring that the selected sites are technically suitable for both agricultural activities and solar power generation.

Bidding to Follow Single-Stage Double-Envelope Process

The tender will follow a Single Stage – Double Envelope bidding process, with bids preferably submitted offline.

The primary bidding parameter will be the annual land lease rate offered per acre, in accordance with applicable government land policies.

Tender Details

  • Bidding parameter: Land lease rate in ₹ per acre per year
  • Bidding method: Single Stage – Double Envelope
  • Land tenure: Minimum 27 years
  • Extension: Possible through mutual consent
  • Land type: Government or private agricultural land

The lease rate will be evaluated in line with the prevailing government land policy applicable to the project.

Tender Documents Expected From September 3

The tender documents are tentatively expected to be made available from September 3, 2026, through SECI’s official tender section.

Interested applicants seeking further information regarding the tender can contact Biblesh Meena, Senior Manager (C&P), SECI.

Applicants will need to ensure that their proposed land meets the technical, legal and connectivity requirements specified by SECI.

Agri-PV Model Combines Solar Power and Agriculture

The pilot projects are designed around the Agri-PV model, which enables agricultural land to serve dual purposes.

Under this approach, solar power can be generated while seasonal crops continue to be cultivated on the same land. Such projects can help explore more efficient use of land resources while supporting renewable energy generation.

The two pilot projects in Delhi-NCR are expected to provide an opportunity to demonstrate the feasibility of this model in an agricultural setting.

About Solar Energy Corporation of India (SECI)

Solar Energy Corporation of India Limited (SECI) is a Central Public Sector Enterprise under the Ministry of New and Renewable Energy, Government of India. SECI plays a key role in the development of renewable energy projects and supports India’s transition towards clean energy through project development, tendering and implementation of renewable energy initiatives.

Read also: SECI, CEEW Sign MoU to Accelerate India’s Clean Energy Transition Through Next-Generation Renewable Energy 


Indian Masterminds Stories
Join our WhatsApp Channel
ADVERTISEMENT
ADVERTISEMENT
Related Stories
ADVERTISEMENT
ADVERTISEMENT
NEWS
SECI
SECI Plans Two 5 MW Agri-PV Projects in Delhi-NCR, Seeks 20 Acres of Agricultural Land on Long-Term Lease 
Punjab NDPS Trials Delay Issue
Punjab NDPS Trials Delay Issue: Punjab And Haryana High Court Summons DGP Over Non-Cooperation Of Police Witnesses 
Astra Mk1 And Mk2 Rafale Integration Programme
How Astra Missile Integration Could Make India’s Rafale Fleet Even Deadlier
Tejas Mk2 Roadmap
Why HAL Is Taking A Four-Prototype Route For Tejas Mk2 Before Production
biharforestdepartment
Bihar Eco-Tourism Boom: Over 20 Lakh More Visitors in Two Years
Su-30MKI R-37M Missile Integration
Explained: How R-37M Missiles Will Transform India’s Su-30MKI Fleet
Rec Smart Meter Training
REC Foundation Signs MoA with PSSC to Skill 2,300 Youths in Smart Meter Technology
Akash Missile
How India's Akash Missile Became A Cost-Effective Alternative To One of the Most Deadly and Popular US Missile 
ADVERTISEMENT
ADVERTISEMENT
Videos
ChatGPT Image Aug 20, 2026, 05_46_21 PM
How IPS Officer Keshav Kumar Used Forensics to Crack Gujarat’s Lion Poaching Case
Shakeel Ahmad Ganie IRS Interview
‘My Path Has Not Been Straight’: Shakeel Ahmad Ganie’s Journey to the IRS
Sumit Ramteke tn
IPS Sumit Ramteke on the Cases That Changed His Career and Shook Organized Crime | Video Interview
ADVERTISEMENT
UPSC Stories
Naveen Kumar Saini UPSC CAPF
After 3 NDA Attempts and a 7-Mark Miss, Naveen Kumar Saini Gets AIR 7 in UPSC CAPF 2025
Naveen Kumar Saini secured AIR 7 in UPSC CAPF 2025 after multiple NDA and SSB failures and missing CAPF...
Pankaj Kamboj
Father Died, Family Turned to Farming: How Pankaj Kamboj Fought His Way to CAPF
After losing his father at 14 and helping his family survive through farming, Pankaj Kamboj turned repeated...
Prachi Jain
A Failed Prelims, A Fractured Leg & One More Shot: How Prachi Jain Made AIR 714
Prachi Jain secured AIR 714 in UPSC CSE 2025 after setbacks, injury and two interviews, and now prepares...
CSR NEWS
Rec Smart Meter Training
REC Foundation Signs MoA with PSSC to Skill 2,300 Youths in Smart Meter Technology
REC’s CSR initiative will provide industry-relevant training and certification to youth and skilled workers,...
REC Foundation GEEF Global CSR Award
REC Limited Wins GEEF Global CSR Award 2026 for Excellence in Sports Development & Inclusion
REC Foundation recognised for using sports to promote youth empowerment, talent development, inclusion...
ongc
ONGC Signs MoA for ₹20 Crore CSR Support to Restore 700 Flood-Hit Schools in Assam 
CSR initiative will support restoration of around 650–700 schools, mainly in Sivasagar and Charaideo,...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Latest
SECI
SECI Plans Two 5 MW Agri-PV Projects in Delhi-NCR, Seeks 20 Acres of Agricultural Land on Long-Term Lease 
Punjab NDPS Trials Delay Issue
Punjab NDPS Trials Delay Issue: Punjab And Haryana High Court Summons DGP Over Non-Cooperation Of Police Witnesses 
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Videos
ChatGPT Image Aug 20, 2026, 05_46_21 PM
Shakeel Ahmad Ganie IRS Interview
Sumit Ramteke tn
ADVERTISEMENT
ADVERTISEMENT