23 October 2026
ADVERTISEMENT
ADVERTISEMENT

First Time in the World, Varanasi to Convert Solid Waste into Torrefied Charcoal

In a first experiment in the world, Varanasi to generate energy from waste by first converting it to torrefied charcoal. The plant with the capacity to segregate up to 800 tonnes per day of Municipal Solid Waste, will be installed soon. The plant will be eco-friendly and the waste will pass through a leachate treatment system to prevent the discharge of harmful substances. Municipal Corporation Varanasi and NTPC Vidyut Vyapar Nigam (NVVN) Limited has signed an agreement to make torrefied charcoal from garbage.
Indian Masterminds Stories

Move over Indore, Varanasi is the new kid on the bloc to make energy from municipal waste. The cleanest city in the country, Indore has been earning Rs 8 crore per annum from making bio-CNG and compost and other products from solid waste. The holy city is likely to overtake Indore by employing an innovative technology – to make torrefied charcoal from garbage. Torrefied charcoal is similar to natural coal and can be burnt to produce energy.

The Municipal Corporation and NTPC Vidyut Vyapar Nigam (NVVN) Limited have signed an agreement. This is going to be the first such plant in the country, which is being set up in the parliamentary constituency of PM Narendra Modi. Speaking to the media, Municipal Commissioner Varanasi, Mr Pranay Singh said, “Till now the work of making coal from waste has not been done anywhere in the world. This will be the first time that the work of generating energy from waste will be done.”

The Holy City Varanasi

20 ACRES OF LAND FOR PLANT

For the construction of the plant, the Municipal Corporation has earmarked 25 acres of land in Ramna. The plant will be constructed in 20 acres and arrangement will be made in scientific method to dispose of the waste generated during coal formation in five acres. The cost of the plant will come to Rs 180 crore.

If the utility of the plant in Varanasi is proved, then the plant will be constructed in Indore and Bhopal as well.

800 TONNES OF WASTE PROCESSING PER DAY

According to the study conducted in Dadri, 200 tonnes of coal will be made from 600 tonnes of waste. The plant is being constructed keeping in mind the next 25 years. According to the Municipal Corporation data, 600 tonnes of garbage is generated from the city every day. After the expansion of the city, about 800 tonnes of garbage is estimated to be removed. Therefore, the capacity of the plant will be more than 800 tonnes of waste processing per day.

Garbage around river Ganga in Varanasi

This waste will be produced and will turn to the torrefied charcoal. It will be later be successfully blended with fuel in thermal power plant to generate electricity.

It will be operated by the manufacturing company for two years. After this the responsibility of running the plant will be handed over to the Varanasi Municipal Corporation.

ECO-FRIENDLY PLANT

The scheme will be designed in a modular fashion for assembling, testing, maintaining and replacing the individual subsystems. This plant will be odourless. The emission and noise limits will be as per norms. The plant will be surrounded by a beautiful environment.

Along with it, the waste will pass through a leachate treatment system (the method of disposal by digging a hole in the ground) to prevent the discharge of harmful substances. In addition, human exposure will be limited, as the machines installed in its operation and maintenance will be automated.

Garbage around river Ganga in Varanasi

SIX RUPEES SPENT IN ONE KG OF COAL

It is clear from the study so far that it will cost Rs.6 to make one kg of coal. At the same time, wherever the plant is set up in the country to generate electricity from waste, it costs Rs 11 to 12 per unit, while the maximum sale of electricity per unit in the market is Rs 8.


Indian Masterminds Stories
Join our WhatsApp Channel
ADVERTISEMENT
ADVERTISEMENT
Related Stories
ADVERTISEMENT
ADVERTISEMENT
NEWS
IAS G Sai prasad
Who Is IAS G. Sai Prasad? Andhra Pradesh Chief Secretary Gets Second Six-Month Extension Till May 2027
Indian Railways Wagon Design Policy
Indian Railways Boosts Coal Loading by 22.5% in October, Dispatches 87 More Rakes Daily
Bihar-Police
Bihar Police Reshuffle: 57 Officers Transferred, Alok Ranjan Named Bhagalpur Rural SP, Aprajit Gets Patna
fake-ias-vipra-sharma-sister-shikha
Fake IAS Officer Vipra Sharma and Sister Shikha Denied Bail in Government Job Fraud Case
Indian Navy Training Squadron Maldives Visit
Indian Navy’s First Training Squadron Arrives in Maldives to Strengthen Maritime Cooperation
PFC logo resized Power Finance Corporation Ltd
PFC Incorporates Northern Region Power Transmission Limited for Grid Compensation Project 
pnb
PNB Wins Excellence Award, Secures First Runner-Up Position in Risk & Resilience Under EASE₹ise 8.0
Indian Railways Coal Loading Growth
Indian Railways Records 22.5% Growth in Coal Loading in October 2026, Dispatches 87 More Rakes Daily 
ADVERTISEMENT
ADVERTISEMENT
Videos
Gajendra Singh Shekhawat
How India Plans to Boost Tourism, Create Jobs and Ease Overcrowding : Gajendra Singh Shekhawat on the Road to 2047
Dr Saket Badola IFS
Beyond Tigers and Safaris: How Corbett Literature Festival Wants to Change the Conservation Conversation
PK Jena
Why Technology Cannot Replace Human Connection in Governance: P.K. Jena
ADVERTISEMENT
UPSC Stories
Mavis tak
From Dropping Out of School to Becoming an IPS Officer : How a Father’s Unwavering Support Helped Mavis Tak Achieve Success
For Mavis Tak, becoming an IPS officer once seemed like a distant dream. Despite financial struggles...
Bhikan Rojekar UPSC
He missed MBBS by 1 mark in 2016; Maharashtra’s Bhikan Rojekar secures UPSC AIR 812
Bhikan Rojekar secured AIR 812 in UPSC CSE 2025 in his third attempt. Read how the son of a farm labourer...
Umar Janj UPSC CAPF
15+ Failures Couldn’t Stop Him: Umar Janj Secures AIR 160 in UPSC CAPF 2025
After multiple SSB setbacks, a CAPF interview miss by 12 marks and more than 15 failures, Umar Janj secured...
CSR NEWS
NLC India CSR Dispensary
NLC India Builds ₹1.23 Crore Dispensary in Tamil Nadu’s Ramanathapuram Under CSR Initiative
Inaugurated on October 17, 2026, the new facility at Sri Ramakrishna Math in Keelanagachi aims to strengthen...
MGL CSR initiative
MGL Donates 30-Seater Hydraulic-Lift Bus to NIEPID Davangere Under MGL Saksham CSR Initiative
Inaugurated by MGL Vice President Sanket Dhotre on October 15, 2026, the accessible bus is expected to...
EIL CSR-
Engineers India Distributes Assistive Devices to 55 Divyangjans in Gurugram Under CSR Initiative
EIL’s CSR initiative provides motorised tricycles, hearing aids, wheelchairs and other aids to promote...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Latest
IAS G Sai prasad
Who Is IAS G. Sai Prasad? Andhra Pradesh Chief Secretary Gets Second Six-Month Extension Till May 2027
P Sesh Kumar
BS-VII Emission Norms: Cleaner Cars or More Challenges for Indian Motorists? (Part 2)
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Videos
Gajendra Singh Shekhawat
Dr Saket Badola IFS
PK Jena
ADVERTISEMENT
ADVERTISEMENT