22 October 2026
ADVERTISEMENT
ADVERTISEMENT

BCCL CMD Manoj Kumar Agarwal Reviews Barora, Block-II Operations to Boost Coal Production and Dispatch 

CMD Directs Officials to Increase Rake Loading, Improve Machine Utilisation, Ensure Timely Dewatering and Remove Operational Bottlenecks Across Key Mining Sites 
Indian Masterminds Stories

New Delhi: With higher coal production and faster dispatch high on the operational agenda, Bharat Coking Coal Limited (BCCL) CMD Manoj Kumar Agarwal on Friday visited key mining and siding operations in the Barora and Block-II Areas and reviewed measures to improve operational performance.

During the visit, Agarwal reviewed coal dispatch, mining activities, equipment availability, dewatering, crusher operations and other critical aspects. He issued directions to enhance rake loading capacity, improve machine utilisation, remove encroachments and ensure adequate infrastructure for smooth mining operations.

BCCL CMD Reviews Coal Dispatch at Key Sidings

At KKC-Link Siding in the Barora Area, CMD Manoj Kumar Agarwal reviewed coal dispatch arrangements and directed officials to increase the loading capacity from two to three rakes per day.

At KKC Main Siding in the Block-II Area, he instructed the team to enhance loading capacity from two to 3.5 rakes per day.

The measures are aimed at accelerating coal dispatch and ensuring that increased production is efficiently moved to consumers.

Read also: BCCL Raises Coal Dispatch Targets at BNR and Burragarh Sidings to Boost Evacuation 

Dewatering Measures Directed at AMP Colliery

During his visit to AMP Colliery in the Barora Area, Agarwal reviewed mining operations at Hired Patch-7.

He directed the GM (E&M) and Area Manager (E&M) to ensure timely dewatering to facilitate mining activities and support higher coal production.

Timely removal of water from mining areas is expected to help maintain operational continuity and improve productivity.

Focus on Machine Availability and Productivity

At the AMP Departmental OC Patch, the CMD directed officials to immediately improve:

  • Machine availability
  • Capacity utilisation
  • Equipment productivity
  • Overall operational efficiency

The directions are intended to ensure better utilisation of available mining equipment and remove constraints affecting production.

Encroachments to Be Removed for Mining Operations

At Left-out Patch-B, Agarwal instructed officials to remove the remaining encroachments to facilitate the commencement of mining operations.

Officials were directed to complete the required action so that mining activities can begin by September 15.

The removal of operational obstructions is expected to help unlock additional mining capacity and support higher production.

Two Additional Excavators and Dumpers Ordered at Damoda Colliery

At the Departmental OC Patch of Damoda Colliery, the CMD directed the GM, Barora Area and GM, Excavation to deploy two additional excavators along with adequate dumpers.

Before deploying the equipment, officials were asked to create sufficient obstruction-free working space by shifting encroachers.

The move is aimed at strengthening excavation capacity and improving the pace of mining operations at the patch.

Lighting and Crusher Operations Also Reviewed

Agarwal also reviewed lighting arrangements and crusher operations during his visit.

He directed officials to ensure adequate lighting during night operations to support safe and efficient working conditions.

He also instructed teams to undertake timely maintenance of mining and allied equipment to minimise breakdowns and maintain operational efficiency.

BCCL Focuses on Higher Production and Faster Dispatch

The CMD’s directions across the Barora and Block-II Areas are focused on improving machine utilisation, addressing operational bottlenecks and increasing productivity.

Key priorities include:

  • Increasing rake loading capacity at major sidings
  • Improving machine availability and capacity utilisation
  • Ensuring timely dewatering at mining patches
  • Removing encroachments to enable mining operations
  • Deploying additional excavators and dumpers
  • Strengthening night-time lighting arrangements
  • Ensuring timely maintenance of mining and allied equipment
  • Accelerating coal production and dispatch

These measures are expected to contribute to improved production and faster coal movement across Bharat Coking Coal Limited (BCCL).

About BCCL

Bharat Coking Coal Limited (BCCL) is a subsidiary of Coal India Limited (CIL) engaged primarily in the exploration, mining and production of coking coal. Headquartered in Dhanbad, Jharkhand, BCCL operates several coal mines and plays an important role in meeting the coking coal requirements of India’s steel industry.

Read also: BCCL Records Highest Single-Day Coal Dispatch of FY2026-27 at 1,20,557 Tonnes


Indian Masterminds Stories
Join our WhatsApp Channel
ADVERTISEMENT
ADVERTISEMENT
Related Stories
ADVERTISEMENT
ADVERTISEMENT
NEWS
PFC logo resized Power Finance Corporation Ltd
PFC Incorporates Northern Region Power Transmission Limited for Grid Compensation Project 
pnb
PNB Wins Excellence Award, Secures First Runner-Up Position in Risk & Resilience Under EASE₹ise 8.0
Indian Railways Coal Loading Growth
Indian Railways Records 22.5% Growth in Coal Loading in October 2026, Dispatches 87 More Rakes Daily 
GYANDEEP Hindi Library
Defence Secretary Inaugurates Hindi Library ‘GYANDEEP’ at Sena Bhawan Under Special Campaign 6
India Post
India Post Crosses ₹4,000 Crore Quarterly Revenue for Two Consecutive Quarters, Records 24% Growth in H1 FY27
NALCO CVOs
NALCO Hosts CVOs’ Meet in Bhubaneswar to Strengthen Preventive Vigilance and Ethical Governance
BHEL_resized
BHEL Appoints Manepalli Sridhar as Director (Human Resources) Until August 2028 
K
Who Is K. Phanindra Reddy? Retired IAS Officer Appointed TNRERA Chairperson in Tamil Nadu
ADVERTISEMENT
ADVERTISEMENT
Videos
Gajendra Singh Shekhawat
How India Plans to Boost Tourism, Create Jobs and Ease Overcrowding : Gajendra Singh Shekhawat on the Road to 2047
Dr Saket Badola IFS
Beyond Tigers and Safaris: How Corbett Literature Festival Wants to Change the Conservation Conversation
PK Jena
Why Technology Cannot Replace Human Connection in Governance: P.K. Jena
ADVERTISEMENT
UPSC Stories
Mavis tak
From Dropping Out of School to Becoming an IPS Officer : How a Father’s Unwavering Support Helped Mavis Tak Achieve Success
For Mavis Tak, becoming an IPS officer once seemed like a distant dream. Despite financial struggles...
Bhikan Rojekar UPSC
He missed MBBS by 1 mark in 2016; Maharashtra’s Bhikan Rojekar secures UPSC AIR 812
Bhikan Rojekar secured AIR 812 in UPSC CSE 2025 in his third attempt. Read how the son of a farm labourer...
Umar Janj UPSC CAPF
15+ Failures Couldn’t Stop Him: Umar Janj Secures AIR 160 in UPSC CAPF 2025
After multiple SSB setbacks, a CAPF interview miss by 12 marks and more than 15 failures, Umar Janj secured...
CSR NEWS
NLC India CSR Dispensary
NLC India Builds ₹1.23 Crore Dispensary in Tamil Nadu’s Ramanathapuram Under CSR Initiative
Inaugurated on October 17, 2026, the new facility at Sri Ramakrishna Math in Keelanagachi aims to strengthen...
MGL CSR initiative
MGL Donates 30-Seater Hydraulic-Lift Bus to NIEPID Davangere Under MGL Saksham CSR Initiative
Inaugurated by MGL Vice President Sanket Dhotre on October 15, 2026, the accessible bus is expected to...
EIL CSR-
Engineers India Distributes Assistive Devices to 55 Divyangjans in Gurugram Under CSR Initiative
EIL’s CSR initiative provides motorised tricycles, hearing aids, wheelchairs and other aids to promote...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Latest
PFC logo resized Power Finance Corporation Ltd
PFC Incorporates Northern Region Power Transmission Limited for Grid Compensation Project 
pnb
PNB Wins Excellence Award, Secures First Runner-Up Position in Risk & Resilience Under EASE₹ise 8.0
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Videos
Gajendra Singh Shekhawat
Dr Saket Badola IFS
PK Jena
ADVERTISEMENT
ADVERTISEMENT