9 November 2026
ADVERTISEMENT
ADVERTISEMENT

Big Boost For Tejas Mk1A: HAL Expects 12 Additional GE F404 Engines Before Year-End

HAL is expected to receive 12 more GE F404 engines by December 2026, helping accelerate Tejas Mk1A fighter jet production and future deliveries to the Indian Air Force.
HAL LUH Helicopter Programme 
Indian Masterminds Stories

New Delhi: HAL GE F404 engines deal for Tejas Mk1A programme is expected to receive a major boost in the coming months. Hindustan Aeronautics Limited (HAL) is likely to receive 12 additional GE F404-IN20 engines between October and December 2026, helping speed up the production and delivery of the Tejas Mk1A fighter aircraft for the Indian Air Force (IAF).

According to statements made by Defence Secretary Rajesh Kumar Singh at the NDTV Defence Summit 2026, engine deliveries from GE Aerospace are expected to increase significantly during the final quarter of the year. This development could help resolve one of the biggest challenges faced by the Tejas Mk1A programme.

Details of HAL GE F404 Engines Deal

GE Aerospace manufactures the F404-IN20 engine that powers the Tejas Mk1A fighter jet.

Read also: Why HAL Has 27 Tejas Mk1A Fighters Ready But Only 10 Will Be Delivered First By March 2027

The company has already supplied 10 engines to HAL, including three engines delivered recently in August. Officials now expect four engines per month to arrive from October through December. If the delivery schedule remains on track, HAL will receive 12 more engines before the end of the year, bringing the total number of engines supplied to 22.

Why Engine Deliveries Matter

Engine shortages have been one of the main reasons behind delays in the Tejas Mk1A programme. HAL has already built several aircraft structures, but many of them are waiting for engines before they can move to final assembly, testing, and certification. Without engines, completed airframes cannot undergo ground trials, flight testing, or final delivery to the Indian Air Force.

HAL GE F404 Engines Deal: Tejas Mk1A Production Expected To Accelerate

The arrival of additional engines is expected to improve production speed at HAL’s facilities. Reports indicate that around 27 to 30 Tejas Mk1A airframes have already been manufactured or are in advanced stages of production.

Many of these aircraft are currently waiting for engine integration before they can move forward in the production cycle. With a steady flow of engines, HAL can begin installing powerplants, conducting system checks, and preparing aircraft for delivery.

Tejas Mk1A: A Key Fighter For The Indian Air Force

The Tejas Mk1A is an upgraded version of India’s indigenous Light Combat Aircraft (LCA). It features advanced avionics, improved radar systems, electronic warfare capabilities, and enhanced operational performance compared to earlier variants. The aircraft is expected to play a major role in strengthening the combat capability of the Indian Air Force.

India has placed a large order for Tejas Mk1A fighters to replace ageing aircraft and improve squadron strength.

HAL Targets Squadron Deliveries By 2027

Defence Secretary Rajesh Kumar Singh stated that HAL expects to begin delivering a full squadron of Tejas Mk1A aircraft by late 2026 or early 2027. However, successful execution will depend not only on engine deliveries but also on the completion of radar integration, software validation, and other technical processes. Each aircraft must pass extensive testing and certification before entering operational service.

Engine Delivery Alone Does Not Complete An Aircraft

Receiving an engine is only one step in the production process. After installation, the aircraft undergoes system integration, ground testing, engine runs, flight evaluations, and safety checks. Only after completing these stages can the fighter jet be handed over to the Indian Air Force.

This means that while increased engine deliveries are positive, final aircraft deliveries will still require careful testing and validation.

India Expands Tejas Mk1A Fleet Plans

The Indian Government has expanded plans for the Tejas Mk1A programme to strengthen national air power. The total order has reportedly increased to 180 Tejas Mk1A aircraft, creating a long-term requirement for engine production and support.

This expansion highlights the importance of maintaining a steady supply chain for critical components such as engines.

GE And HAL Strengthen Long-Term Cooperation

Beyond supplying engines, GE Aerospace and India are also working to improve long-term maintenance capabilities. A Maintenance, Repair, and Overhaul (MRO) facility is being planned to support F404 engines within India.

This facility will help reduce dependence on overseas repair centres and improve engine availability for the Indian Air Force. The initiative is expected to support indigenous defence manufacturing and strengthen India’s aerospace ecosystem.

Read also: From Tejas Mk1A To Rafale: How India Plans To Fix Its Fighter Squadron Deficit

FAQs

Why Are GE F404 Engines Important For Tejas Mk1A?

The GE F404-IN20 engine powers the Tejas Mk1A fighter jet. Without the engine, aircraft cannot complete assembly, testing, or delivery to the Indian Air Force.

How Many GE F404 Engines Will HAL Receive By December 2026?

HAL is expected to receive 12 additional GE F404-IN20 engines between October and December 2026, with four engines arriving each month.

How Many Tejas Mk1A Aircraft Has India Ordered?

India has expanded its procurement plans and is expected to operate a fleet of around 180 Tejas Mk1A fighter aircraft in the coming years.


Indian Masterminds Stories
Join our WhatsApp Channel
ADVERTISEMENT
ADVERTISEMENT
Related Stories
ADVERTISEMENT
ADVERTISEMENT
NEWS
IPS Malay Jain
Who is IPS Malay Jain? Author of ‘Dhaak Ke Teen Paat’ Appointed Balaghat SP, Gets Additional Charge of Hawk Force
Yogi Adityanath
From Forest Settlements to Revenue Villages: CM Yogi Adityanath to Celebrate Diwali With Van Tangiya Community, Unveil 52 Projects Worth ₹82 Crore
Deoranjan Kumar Singh
Odisha Plans Drug-Free Zones Within 500 Metres of Schools, Colleges and Universitie
Vanvasi Ram Lok Chitrakoot Feature
MP CM Mohan Yadav Announces Vanvasi Ram Lok in Chitrakoot, Ram Raja Lok in Orchha
Facebook Page Blocking
Hansi Clash: Haryana DGP to Monitor Probe After High Court Flags Need for Fair Investigation
Shri Ramraja Lok Project Orchha Feature
MP CM Mohan Yadav Reviews Shri Ramraja Lok Project in Orchha; ₹239.87 Crore Tourism Works Underway
Free UPSC Coaching in Chhattisgarh
Chhattisgarh Invites Applications for Free UPSC Coaching in Delhi; 290 Seats Available Under CG-ACE Scheme
ED powers
Karnataka High Court Restricts ED Powers, Rules ED Cannot File Private Complaint When Police Refuse To Act
ADVERTISEMENT
ADVERTISEMENT
Videos
Five years after Kargil, India sent its cricketing heroes to Pakistan where terrorism posed a deadly threat. The man guarding them, former Special Director of Intelligence Bureau, Mr. Yashovardhan Azad, reveals what all went behind the scenes during that crucial tour. 
Trust No One, Said His Instinct in Pakistan
Gajendra Singh Shekhawat
How India Plans to Boost Tourism, Create Jobs and Ease Overcrowding : Gajendra Singh Shekhawat on the Road to 2047
Dr Saket Badola IFS
Beyond Tigers and Safaris: How Corbett Literature Festival Wants to Change the Conservation Conversation
ADVERTISEMENT
UPSC Stories
Aniket Sagar ICoAS
No Coaching, Full-Time Job and Two Attempts: How Aniket Sagar Cleared ICoAS
Aniket Sagar, a chartered accountant from Bundelkhand, cleared UPSC ICoAS 2025 after working at PwC,...
IDAS Himanshu Tembhekar
Should UPSC Aspirants Give Up Their Hobbies? IDAS Officer Himanshu Tembhekar Explains
Should UPSC aspirants give up their hobbies? IDAS officer Himanshu Tembhekar explains how hobbies help...
UPSC Story
He Taught Students to Meet Expenses. Today, Sachin Bhadouria is a Scientist ‘B’ at CWPRS
Sachin Bhadouria overcame financial challenges and a Hindi-medium background to secure AIR 2 in a UPSC...
CSR NEWS
NCL CSR Blood Bank Project
NCL Signs ₹1.16 Crore CSR MoU to Establish Blood Bank at District Hospital in Singrauli
The project will fund essential medical equipment, furniture and renovation of the existing building...
REC Foundation Solar Street Light
REC Foundation to Install 350 Solar Street Lights Across Six Districts of West Bengal to Improve Rural Safety 
The CSR initiative, undertaken in partnership with Y4D Foundation, aims to improve night-time safety...
nalco
NALCO Signs MoU with SDI Bhubaneswar to Provide Skill Training to 60 Youths in Odisha
The three-month CSR programme will benefit youths from villages near NALCO's Angul and Koraput complexes,...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Latest
IAS Ravi Kant
India’s Waste Crisis Is Growing. Can Scientific Waste Management Turn It Into an Opportunity?
IPS Malay Jain
Who is IPS Malay Jain? Author of ‘Dhaak Ke Teen Paat’ Appointed Balaghat SP, Gets Additional Charge of Hawk Force
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Videos
Five years after Kargil, India sent its cricketing heroes to Pakistan where terrorism posed a deadly threat. The man guarding them, former Special Director of Intelligence Bureau, Mr. Yashovardhan Azad, reveals what all went behind the scenes during that crucial tour. 
Gajendra Singh Shekhawat
Dr Saket Badola IFS
ADVERTISEMENT
ADVERTISEMENT