Skip to main content

https://indianmasterminds.com

ADVERTISEMENT
ADVERTISEMENT

PM Modi Inaugurates 1000 MW Bikaner Solar Project by SJVN, Boosting India’s Renewable Energy Capacity

₹5,492 crore project to generate 56,482 MU of clean power over 25 years, reduce emissions, and strengthen Make in India solar manufacturing.
Indian Masterminds Stories

Bikaner: In a major boost to India’s clean energy transition, Hon’ble Prime Minister Narendra Modi inaugurated the 1000 MW Bikaner Solar Power Project of SJVN Limited from Pachpadra, Rajasthan. The event marks a significant milestone in India’s renewable energy journey and strengthens the country’s commitment to sustainability and energy security.

High-Level Dignitaries Attend Inauguration Ceremony

The historic inauguration was attended by several senior leaders and dignitaries, including:

  • Haribhau Kisanrao Bagde, Governor of Rajasthan
  • Bhajan Lal Sharma, Chief Minister of Rajasthan
  • Manohar Lal Khattar, Union Minister of Power, Housing & Urban Affairs
  • Hardeep Singh Puri, Union Minister, Petroleum & Natural Gas
  • Arjun Ram Meghwal, Union Minister, Law & Justice
  • Deputy Chief Ministers Diya Kumari and Dr. Prem Chand Bairwa

Senior officials of SJVN and its renewable arm, SJVN Green Energy Limited, also joined the event virtually.

Read also: SJVN Limited Appoints Suprakash Adhikari as Director (Projects) on Additional Charge to Strengthen Clean Energy 

Bikaner Solar Project: India’s Largest Single-Location EPC Solar Plant

Developed by SGEL, the project is located in Bikaner, Rajasthan, and has been built with an investment of approximately ₹5,492 crore across nearly 5,000 acres.

It stands as:

  • India’s largest single-location EPC solar project
  • Developed under the Domestic Content Requirement (DCR) category
  • A major example of indigenous renewable energy infrastructure

Massive Clean Energy Generation Capacity

The 1000 MW solar project is expected to generate:

  • 2,454.84 million units (MU) in the first year
  • 56,482.14 MU over its 25-year operational life

The electricity generated will be supplied to:

  • Rajasthan – 500 MW
  • Uttarakhand – 200 MW
  • Jammu & Kashmir – 300 MW

This distribution is expected to significantly strengthen India’s clean energy grid.

Major Contribution to Climate Action Goals

The project is estimated to reduce nearly 2.79 billion kilograms of carbon emissions over its lifetime, making it a key contributor to India’s climate commitments and environmental sustainability targets.

Boost to Make in India and Atmanirbhar Bharat

A key highlight of the project is its strong alignment with national initiatives such as Make in India and Atmanirbhar Bharat.

The project has utilized:

  • 24.22 lakh domestically manufactured DCR solar modules
  • 175 crore indigenous solar cells

This has significantly boosted domestic manufacturing and strengthened India’s renewable energy supply chain.

Employment and Regional Development Impact

Beyond clean energy generation, the project has contributed significantly to socio-economic development:

  • Over 2,000 direct and indirect jobs created during construction
  • Continued employment support during operational phase
  • Development of roads, transmission systems, and local infrastructure
  • Overall boost to economic growth in the Bikaner region

SJVN: Strengthening India’s Renewable Energy Future

SJVN Limited, a Navratna Central Public Sector Enterprise under the Ministry of Power, currently has an installed capacity of 4,196.5 MW and operates transmission lines spanning 123 km.

The commissioning of the Bikaner Solar Power Project further strengthens SJVN’s role in expanding India’s renewable energy portfolio and supporting the nation’s transition towards a sustainable and energy-secure future.

About SJVN Limited 

SJVN Limited is a leading Navratna Public Sector Undertaking under the Government of India engaged in power generation and transmission. The company operates across hydro, solar, and other renewable energy segments, contributing significantly to India’s clean energy expansion and infrastructure development goals.

Read also: SJVN Limited Wins 3rd Prize in Swachhta Hi Sewa Pakhwada Awards 2024–25 by Ministry of Power


Indian Masterminds Stories
Join our WhatsApp Channel
ADVERTISEMENT
ADVERTISEMENT
Related Stories
ADVERTISEMENT
ADVERTISEMENT
NEWS
GRID
Grid-India Invites Indian Companies to Develop Indigenous SCADA and Energy Management Software 
khadi KVIC
What’s Driving Khadi’s ₹1.87 Lakh Crore Boom? The Answer Lies Beyond the Charkha
IRS Officer Indian revenue Services
2 IRS Officers Attached to CESTAT Delhi and Bhubaneswar GST Zone; Principal Commissioner Ajay Among Them
Uttar Pradesh Bus Station Modernisation
Uttar Pradesh Plans Airport-Style Upgrade of Five Bus Stations With Hotels, AC Waiting Halls
fda bihar
Festive Food Safety Alert: Bihar Cancels Sweet Home Licences, Suspends Cozy Sweets
Nagaraju Maddirala IAS
Who Is Nagaraju Maddirala? Tripura Cadre Ex-IAS Officer Appointed Chairman and MD of IL&FS
RAS to IAS promotion Rajasthan
Centre Promotes 16 Rajasthan RAS Officers to IAS: Gopal Ram Birda, Meghna Chaudhary Among Selectees
Bhawna Bohra Free Bus Service
Chhattisgarh MLA Bhawna Bohra Expands Free Bus Service for College Girls to Kui-Kukdur
ADVERTISEMENT
ADVERTISEMENT
Videos
PK Jena
Why Technology Cannot Replace Human Connection in Governance: P.K. Jena
PK Jena
The IAS Officer Who Put People Before Paperwork: How PK Jena Challenged Corruption and Reformed Governance
Keshav kumar
From Police Officer to Forensic Pioneer: How Dr Keshav Kumar Made Science a Weapon Against Crime
ADVERTISEMENT
UPSC Stories
Aayush Sharma
Three CDS Attempts, Five AFCAT Qualifications & Medical Setback: How Aayush Sharma Secured CAPF AIR 135
After three unsuccessful SSB attempts, five AFCAT qualifications and a medical setback, Aayush Sharma...
Tushar Chaudhary IRMS
He Left Intel, Built COPAL-19, Spent Months at AIIMS, Ran Half Marathons, and Returned to UPSC—Tushar Chaudhary’s Journey to IRMS
UPSC ESE AIR 4 Tushar Chaudhary left a ₹25 LPA Intel job, built COPAL-19, spent months at AIIMS, ran...
Mayank Sachan UPSC CAPF
15+ Exam Failures, 15 Years in the Navy: How Mayank Sachan Secured AIR 343 in UPSC CAPF
Former Indian Navy sailor Mayank Sachan secured AIR 343 in UPSC CAPF 2025 after 15+ exam failures, two...
CSR NEWS
HURL Project PHULWARI
HURL Signs MoU Under Project PHULWARI to Strengthen Healthcare and Childcare Facilities 
In partnership with Hindustan Latex Family Planning Promotion Trust, HURL will provide need-based medical...
NTPC CCQC
NTPC Bongaigaon Wins Six Gold Awards at CCQC 2026, Adds Two National Honours for Safety and CSR 
The power station earns recognition for quality improvement projects, occupational health and environmental...
ntpc
NTPC Bongaigaon Signs MoA to Establish ₹13.28 Crore Archery Academy in Mizoram Under CSR Initiative
The three-year project at Lengpui in Mamit district will provide young athletes with dedicated training...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Latest
GRID
Grid-India Invites Indian Companies to Develop Indigenous SCADA and Energy Management Software 
khadi KVIC
What’s Driving Khadi’s ₹1.87 Lakh Crore Boom? The Answer Lies Beyond the Charkha
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Videos
PK Jena
PK Jena
Keshav kumar
ADVERTISEMENT
ADVERTISEMENT